Skip to main content

Pre-Production Go-Live Checklist

The Pre-Production Go-Live Checklist is an essential tool for teams about to transition to new systems. This comprehensive guide provides step-by-step verification items to ensure that all necessary tests, backups, and stakeholder approvals are in place, minimizing risks associated with migration. By following this checklist, teams can confidently execute their go-live plans and safeguard against common pitfalls.

Estimated Time
2-4 hours
Type
pre production
Category
Project Management
Steps
10

Pre-Production Go-Live Checklist

When to Use This Checklist

The Pre-Production Go-Live Checklist is a critical tool in your migration journey. Use this checklist just before transitioning to the new system or platform to ensure that all necessary verifications, configurations, and tests are complete. This phase is pivotal as it determines the success of your migration and the stability of the system post-launch.

Detailed Breakdown of Each Checklist Item

  1. Final Testing

    • What to do: Conduct comprehensive testing, including unit tests, integration tests, and user acceptance testing (UAT).
    • Why it matters: Ensures functionality and performance meet requirements.
    • Verification: Check test results and confirm that all critical use cases have passed.
  2. Data Integrity Check

    • What to do: Validate that all data migrated correctly without corruption or loss.
    • Why it matters: Protects against data discrepancies that can lead to operational issues.
    • Verification: Compare sample data sets from the old and new systems.
  3. Backup Procedures

    • What to do: Ensure that backup systems and processes are in place and functioning.
    • Why it matters: Safeguards against data loss during or after migration.
    • Verification: Test backup and restore functionality to confirm its reliability.
  4. User Training

    • What to do: Conduct training sessions for all users on new systems and processes.
    • Why it matters: Enhances user confidence and reduces operational errors post-launch.
    • Verification: Gather feedback and assess user readiness through surveys or quizzes.
  5. Security Review

    • What to do: Perform a thorough security audit of the new system.
    • Why it matters: Protects against potential vulnerabilities that could be exploited.
    • Verification: Document findings and ensure remediation of any identified issues.
  6. Monitoring Setup

    • What to do: Configure monitoring tools for performance and error tracking.
    • Why it matters: Allows for proactive identification of issues in real-time.
    • Verification: Check that monitoring alerts are set up and functioning correctly.
  7. Stakeholder Approval

    • What to do: Obtain final sign-off from key stakeholders and decision-makers.
    • Why it matters: Ensures alignment and support from all parties involved.
    • Verification: Document approvals and any conditions attached to the go-live.
  8. Cutover Plan

    • What to do: Have a detailed plan for switching from the old system to the new one, including timelines and responsibilities.
    • Why it matters: Minimizes downtime and confusion during the transition.
    • Verification: Review the plan with the team to confirm understanding and readiness.
  9. Rollback Plan

    • What to do: Establish a clear plan for reverting to the old system in case of failure.
    • Why it matters: Provides a safety net and reduces risk during the go-live.
    • Verification: Ensure all team members are aware of the rollback procedure.
  10. Communication Plan

  • What to do: Set up a communication strategy for informing stakeholders about the go-live.
  • Why it matters: Keeps everyone informed and reduces anxiety around the transition.
  • Verification: Share the plan with the team and stakeholders before launch.

Common Items Teams Forget or Underestimate

  • Final Testing: Often rushed or improperly conducted.
  • User Training: Neglecting this can lead to frustration and errors.
  • Backup Procedures: Failing to verify backups can be catastrophic if issues arise.

Adapting This Checklist for Different Contexts

  • For Cloud Migrations: Include checks for cloud-specific configurations and security settings.
  • For Large Enterprises: Consider additional layers of approval and broader stakeholder engagement due to complexity.

Integration with Other Migration Phases and Checklists

This checklist is designed to integrate seamlessly with other migration phases, such as:

  • Pre-Migration Checklist: Ensures readiness before migration starts.
  • Post-Go-Live Checklist: Validates that the system is functioning correctly after launch.

By following this Pre-Production Go-Live Checklist, teams can mitigate risks and ensure a smoother transition to their new systems, enhancing overall project success.

Vibgrate CLI

See a real scan run

A replay of the actual CLI running against our test repositories — live progress, real findings, a genuine DriftScore. Nothing executes in your browser.

Replay
demo@vibgrate — bash
npx @vibgrate/cli scan
 
╭──────────────────────────────────────────╮
Vibgrate Drift Report
╰──────────────────────────────────────────╯
 
── node-turborepo (node) .
Runtime: >=18.0.0 (6 majors behind)
Frameworks:
Turbo: 1.13.4 → 2.10.12 (1 behind)
TypeScript: 5.9.3 → 7.0.2 (2 behind)
Dependencies:
1 current 1 1-behind 3 2+ behind 1 unknown
 
── @repo/admin (node) apps/admin
Frameworks:
TanStack Query: 5.102.5 → 5.102.5 (current)
React: 18.3.1 → 19.2.8 (1 behind)
React DOM: 18.3.1 → 19.2.8 (1 behind)
TypeScript: 5.9.3 → 7.0.2 (2 behind)
Vite: 5.4.21 → 8.2.2 (3 behind)
Dependencies:
3 current 9 1-behind 3 2+ behind 4 unknown
 
── @repo/api (node) apps/api
Frameworks:
Express: 4.22.2 → 5.2.1 (1 behind)
TypeScript: 5.9.3 → 7.0.2 (2 behind)
Vitest: 1.6.1 → 4.1.11 (3 behind)
Dependencies:
7 current 5 1-behind 3 2+ behind 4 unknown
 
── @repo/web (node) apps/web
Frameworks:
Next.js: 14.2.35 → 16.3.3 (2 behind)
React: 18.3.1 → 19.2.8 (1 behind)
React DOM: 18.3.1 → 19.2.8 (1 behind)
TypeScript: 5.9.3 → 7.0.2 (2 behind)
Dependencies:
2 current 6 1-behind 3 2+ behind 5 unknown
 
── @repo/config (node) packages/config
Frameworks:
TypeScript: 5.9.3 → 7.0.2 (2 behind)
Dependencies:
2 current 2 1-behind 5 2+ behind 0 unknown
 
── @repo/database (node) packages/database
Frameworks:
Prisma: 5.22.0 → 7.10.0 (2 behind)
TypeScript: 5.9.3 → 7.0.2 (2 behind)
Dependencies:
1 current 0 1-behind 3 2+ behind 1 unknown
 
── @repo/types (node) packages/types
Frameworks:
TypeScript: 5.9.3 → 7.0.2 (2 behind)
Dependencies:
0 current 0 1-behind 1 2+ behind 1 unknown
 
── @repo/ui (node) packages/ui
Frameworks:
React: 18.3.1 → 19.2.8 (1 behind)
TypeScript: 5.9.3 → 7.0.2 (2 behind)
React: 18.3.1 → 19.2.8 (1 behind)
Dependencies:
1 current 4 1-behind 1 2+ behind 1 unknown
 
── @repo/utils (node) packages/utils
Frameworks:
TypeScript: 5.9.3 → 7.0.2 (2 behind)
Vitest: 1.6.1 → 4.1.11 (3 behind)
Dependencies:
0 current 1 1-behind 2 2+ behind 1 unknown
 
Tech Stack
Frontend: React, React DOM
Meta-frameworks: Next.js
Bundlers: tsx, Turbo, Vite
CSS / UI: Autoprefixer, PostCSS, Tailwind CSS
Backend: Express
ORM / Database: Prisma, Prisma Client
Testing: Vitest
Lint & Format: ESLint, ESLint Prettier, ESLint React, Prettier, typescript-eslint
 
Services & Integrations
Auth: JWT 9.0.3
Databases: Prisma 5.22.0
 
TypeScript
v5.3.3 · strict ✔ · MIXED · target: ES2022
 
Build & Deploy
Package Managers: pnpm
Monorepo: npm-workspaces, pnpm-workspaces, turbo
 
Product Purpose Signals
Frameworks: react, nextjs
Evidence: 177
Top Signals:
- [heading] Dashboard (apps/admin/src/pages/Dashboard.tsx)
- [title] Revenue Overview (apps/admin/src/pages/Dashboard.tsx)
- [copy] workspace:* (packages/ui/package.json)
- [copy] ./dist (packages/ui/tsconfig.json)
- [copy] ./src/index.ts (packages/ui/package.json)
- [copy] @repo/config/tsconfig-base.json (packages/ui/tsconfig.json)
- [copy] @repo/ui (packages/ui/package.json)
- [copy] #3b82f6 (apps/admin/src/pages/Dashboard.tsx)
Unknowns:
- No pricing or billing evidence found.
- No integrations/connectors evidence found.
- No route structure evidence found.
 
Security Posture
Lockfile ✖ · .env ✔ · node_modules ✔
 
Platform
Native modules: turbo
 
Code Quality
Files: 36 · Functions: 183 · Avg complexity: 2.62 · Avg length: 21.13 lines
Max nesting: 2 · Circular deps: 0 · Dead code: 0%
God files: apps/admin/src/pages/Products (448 lines)
 
Database Schema
postgresql · 8 models · 1 enum
Models: Address, CartItem, Category, Order, OrderItem (+3 more)
 
Findings (16 errors, 11 warnings)
Node.js runtime ">=18.0.0" reached end-of-life on 2025-04-30 (latest: 24.0.0).
vibgrate/runtime-eol in .
TypeScript is 2 major versions behind (current: 5.9.3, latest: 7.0.2).
vibgrate/framework-major-lag in .
60% of dependencies are 2+ major versions behind in node-turborepo.
vibgrate/dependency-rot in .
@types/node is 6 major versions behind (spec: ^20.11.0, latest: 26.3.0).
vibgrate/dependency-major-lag in .
TypeScript is 2 major versions behind (current: 5.9.3, latest: 7.0.2).
vibgrate/framework-major-lag in apps/admin
Vite is 3 major versions behind (current: 5.4.21, latest: 8.2.2).
vibgrate/framework-major-lag in apps/admin
vite is 3 major versions behind (spec: ^5.0.12, latest: 8.2.2).
vibgrate/dependency-major-lag in apps/admin
TypeScript is 2 major versions behind (current: 5.9.3, latest: 7.0.2).
vibgrate/framework-major-lag in apps/api
Vitest is 3 major versions behind (current: 1.6.1, latest: 4.1.11).
vibgrate/framework-major-lag in apps/api
@types/node is 6 major versions behind (spec: ^20.11.0, latest: 26.3.0).
vibgrate/dependency-major-lag in apps/api
vitest is 3 major versions behind (spec: ^1.2.1, latest: 4.1.11).
vibgrate/dependency-major-lag in apps/api
Next.js is 2 major versions behind (current: 14.2.35, latest: 16.3.3).
vibgrate/framework-major-lag in apps/web
TypeScript is 2 major versions behind (current: 5.9.3, latest: 7.0.2).
vibgrate/framework-major-lag in apps/web
@types/node is 6 major versions behind (spec: ^20.11.0, latest: 26.3.0).
vibgrate/dependency-major-lag in apps/web
TypeScript is 2 major versions behind (current: 5.9.3, latest: 7.0.2).
vibgrate/framework-major-lag in packages/config
56% of dependencies are 2+ major versions behind in @repo/config.
vibgrate/dependency-rot in packages/config
eslint-plugin-react-hooks is 3 major versions behind (spec: ^4.6.0, latest: 7.1.1).
vibgrate/dependency-major-lag in packages/config
Prisma is 2 major versions behind (current: 5.22.0, latest: 7.10.0).
vibgrate/framework-major-lag in packages/database
TypeScript is 2 major versions behind (current: 5.9.3, latest: 7.0.2).
vibgrate/framework-major-lag in packages/database
75% of dependencies are 2+ major versions behind in @repo/database.
vibgrate/dependency-rot in packages/database
TypeScript is 2 major versions behind (current: 5.9.3, latest: 7.0.2).
vibgrate/framework-major-lag in packages/types
100% of dependencies are 2+ major versions behind in @repo/types.
vibgrate/dependency-rot in packages/types
TypeScript is 2 major versions behind (current: 5.9.3, latest: 7.0.2).
vibgrate/framework-major-lag in packages/ui
TypeScript is 2 major versions behind (current: 5.9.3, latest: 7.0.2).
vibgrate/framework-major-lag in packages/utils
Vitest is 3 major versions behind (current: 1.6.1, latest: 4.1.11).
vibgrate/framework-major-lag in packages/utils
67% of dependencies are 2+ major versions behind in @repo/utils.
vibgrate/dependency-rot in packages/utils
vitest is 3 major versions behind (spec: ^1.2.1, latest: 4.1.11).
vibgrate/dependency-major-lag in packages/utils
 
╭──────────────────────────────────────────╮
Top Priority Actions
╰──────────────────────────────────────────╯
 
1. Upgrade EOL runtime in node-turborepo
End-of-life runtimes no longer receive security patches and block ecosystem upgrades.
./.
>=18.0.0 → 24.0.0 (6 majors behind)
Impact: −10 drift points (runtime & EOL)
 
2. Fix security posture: no lockfile found
Without a lockfile, installs are non-deterministic. Run the install command to generate one and commit it.
./
Missing: package-lock.json, pnpm-lock.yaml, or yarn.lock
 
3. Upgrade Vite 5.4.21 → 8.2.2 in @repo/admin (+2 more)
3 major versions behind. Major framework drift increases breaking change risk and blocks access to security fixes and performance improvements.
./apps/admin
Vite: 5.4.21 → 8.2.2 (3 majors behind)
./apps/api
Vitest: 1.6.1 → 4.1.11 (3 majors behind)
./packages/utils
Vitest: 1.6.1 → 4.1.11 (3 majors behind)
Impact: −5–15 drift points
 
4. Reduce dependency rot in @repo/types (100% severely outdated)
1 of 1 dependencies are 2+ majors behind. Run `npm outdated` and prioritise packages with known CVEs or breaking API changes.
./packages/types
typescript: 5.9.3 → 7.0.2 (2 majors behind)
Impact: −5–10 drift points
 
5. Reduce dependency rot in @repo/database (75% severely outdated)
3 of 4 dependencies are 2+ majors behind. Run `npm outdated` and prioritise packages with known CVEs or breaking API changes.
./packages/database
@prisma/client: 5.22.0 → 7.10.0 (2 majors behind)
prisma: 5.22.0 → 7.10.0 (2 majors behind)
typescript: 5.9.3 → 7.0.2 (2 majors behind)
Impact: −5–10 drift points
 
╭──────────────────────────────────────────╮
Architecture Layers
╰──────────────────────────────────────────╯
 
Archetype: nextjs (80% confidence)
Files classified: 24 (11 unclassified)
Folders classified: 8
apps/admin/src presentation 100% 4 files
apps/admin/src/pages presentation 100% 2 files
apps/api/src/middleware middleware 100% 2 files
apps/api/src/routes routing 100% 2 files
apps/web/src/app presentation 100% 4 files
apps/web/src/app/products presentation 100% 2 files
apps/web/src/app/products/[id] presentation 100% 1 file
packages/ui/src presentation 100% 6 files
Unclassified source (sample): 11
 
presentation 15 files drift ████████████████████ 100 risk high
routing 4 files drift ████████████████████ 100 risk high
middleware 2 files drift ███████▍░░░░░░░░░░░░ 37 risk moderate
config 2 files drift ░░░░░░░░░░░░░░░░░░░░ 0 risk none
shared 1 file drift ████████████████████ 100 risk high
 
╭──────────────────────────────────────────╮
DriftScore Summary
╰──────────────────────────────────────────╯
 
DriftScore: 66/100
Risk Level: HIGH
Projects: 9
Classified: 8 nano · 1 micro · 0 small · 0 standard
Billable: 0.42 · 9 detected → 0.42 billable projects (micro-project pricing)
0.1 micro · 0.32 nano
These fractions add up across repositories, then round down to whole billable projects.
 
Score Breakdown
Runtime: ████████████████████ 100
Frameworks: █████████▏░░░░░░░░░░ 46
Dependencies: ██████▏░░░░░░░░░░░░░ 31
EOL Risk: ████████████████████ 100
 
Scanned at 2026-08-26T09:08:28.481Z · 7.1s · 286 files scanned · 56 workspace files · 27 dirs
Press Run to start.